Construction quality acceptance specification for building decoration engineering

Do you know the construction quality acceptance criteria for building decoration and decoration projects? The so-called key points of the construction quality acceptance specification of this building decoration project are very important, so friends and small editors must carefully understand the construction quality of our building decoration and decoration project. What are the detailed introductions of the acceptance specifications, as well as the precautions for the construction quality acceptance specifications of the building decoration and decoration project.


建筑装饰装修工程施工质量验收规范


I. Construction quality acceptance specification for building decoration and decoration works


1. The unit undertaking the construction of the building decoration project should have the corresponding qualifications and should establish the quality management system. The construction unit should prepare the construction organization design and should be examined and approved. The construction unit should be constructed according to the relevant construction technology standards or the approved construction technical plan. Quality control should be implemented throughout the construction process.


2. Personnel who undertake construction of the building decoration project should have a qualification certificate for the corresponding position.


3. The construction quality of the building decoration and decoration project shall comply with the design requirements and the provisions of this code. The construction unit shall be responsible for the quality problems caused by the violation of the design documents and the provisions of this code.


4. During the construction of the building decoration project, it is strictly forbidden to arbitrarily change the main building load-bearing structure or the main function of the building in violation of the design documents. It is strictly forbidden to dismantle the water heating, electric gas communication and other supporting facilities without design confirmation and approval by the relevant departments.


5. The construction unit shall abide by the laws and regulations concerning environmental protection and shall take effective measures to control the pollution and damage caused by the noise and vibration of various dust and exhaust wastes on the construction site.


6. The construction unit shall abide by the laws and regulations concerning construction safety, labor protection, fire prevention and anti-virus, and establish corresponding management systems and shall be equipped with necessary equipment and signs.


7. The building decoration and decoration project shall be processed after the quality inspection of the base or the base layer is completed. The existing floor shall be treated to meet the requirements of this specification before the decoration and decoration of the existing building.


8. Before the construction of the building decoration project, there should be a sample of the main materials or a sample room (piece) and should be confirmed by the relevant parties.


建筑装饰装修工程施工质量验收规范


9. Types of insulation materials used in building decoration and decoration projects with insulation materials on the wall surface and construction techniques should meet the design requirements.


10. Installation and commissioning of pipeline equipment should be completed before the construction of the building decoration project. When it must be synchronized, the decoration and decoration work should be completed before the construction of the veneer layer. The use and maintenance of the pipeline equipment should not be affected. The project must comply with the relevant safety management regulations.


11. The electrical installation of the building decoration and decoration project shall comply with the design requirements and the provisions of the current national standards. It is strictly forbidden to directly bury the wires without passing through the pipe.


12. The environmental conditions for indoor and outdoor decoration and construction projects should meet the requirements of the construction process. The construction environment temperature should not be lower than 5 C. When it is necessary to work below 5C temperature, effective measures should be taken to ensure the quality of the project.


Second, the construction decoration project construction quality acceptance considerations


1. Hydropower acceptance is the key priority for the acceptance of maintenance rights


The acceptance is better in order. For the completion acceptance, the focus is on the acceptance of the “Linzi” increase and decrease in the “surface” project and decoration. The decoration company's supervision is first pre-tested, and then the owner checks whether the project is completed in accordance with the provisions of the contract project, and then checks and accepts according to the contract budget order, so as to avoid errors and omissions.


2. Hydropower acceptance regulations


Although the waterway has been subjected to pressure test during the mid-term acceptance of the renovation project, the closed water test and circuit laying have also been checked and accepted by the concealed project, and the project acceptance form has been signed by the owner, the foreman and the supervisor. With basic quality assurance. However, hydropower projects also involve installation problems with waterway fittings, electrical fittings, lamps, and electrical products.


The above is the decoration quality of the building decoration project introduced by the friends of the home decoration network, what is the construction quality acceptance specification of our building decoration and decoration project, and the attention of the construction quality acceptance specification of the building decoration and decoration project What is the matter. Friends continue to pay attention to our decoration home network to learn more about decoration.


More related wonderful reading:

Building decoration and decoration engineering professional contracting enterprise qualification level standard

Architectural decoration engineering design and construction management, decoration skills

Auto Rewind Air Hose Reel

Automatic Air Hose Reel,Auto Rewind Air Hose Reel,Self Retracting Air Hose Reel,Air Compressor Retractable Hose Reel

NINGBO QIKAI ENVIRONMENTAL TECHNOLOGY CO.,LTD , https://www.hosereelqikai.com