What should I do if the kitchen leaks? Kitchen leak measures

Leaking water in the upstairs kitchen will cause trouble for the living of the downstairs residents. Serious water leakage will cause water to accumulate in the entire ceiling, causing the paint to fall off and seriously affect the residential use of the downstairs residents. Therefore, the leaking water in the upstairs kitchen must be treated in a timely manner. What should I do if the kitchen is leaking upstairs? To solve the leak in the kitchen, we must first understand the cause of the water leakage, and then we can carry out targeted measures to leak water in the kitchen and bathroom. There are two main reasons for leakage of kitchen and bathroom. The first is that the connection between the water supply and the drain pipe is directly connected to the pipeline; the second is that the waterproof treatment is not in place or the waterproof layer is damaged. Here are some questions about kitchen leaks, follow Xiaobian to find out!


厨房漏水


(1) Reasons for water leakage


Case 1: Large area leakage


Large-area leakage water needs to be completely removed from the floor tiles, bonding layers and original waterproof layer of the kitchen and bathroom, and re-waterproofed. Then do the closed water test, and then return to the surface layer after passing the test.


Case 2: Partial leakage


The local leakage water includes the wall root part, the water outlet part, the wall penetrating tube, and the floor slab pipe. These parts should first find the specific location of the leakage, cut these parts with a cutting machine, cut into the original waterproof layer, and find the original waterproof layer. Clean up, repaint the waterproof material, and after the waterproof material is cured, conduct a water shut-off test for 24 hours to 48 hours. The watertight water is qualified, and finally the surface layer of the range is restored.


(B), home improvement kitchen and bathroom waterproof precautions


1, waterproof materials should be selected. It is best to buy and drain the brand with guaranteed quality; the waterproof material must have certificate and test report, and it is strictly forbidden to use expired and invalid waterproof materials. Second, do a water storage test before the renovation. Before the decoration of the kitchen and bathroom, a 48-hour water storage test should be carried out on the floor of the kitchen and toilet to test the construction quality of the waterproof layer. If there is leakage or damage to the waterproof layer, it is necessary to re-construct and re-do the water-tight test. Until there is no leakage.


2. Pay more attention to the slotted ceiling. During the construction process, the wall should be slotted more than 20mm from the ground, and the ground should not be slotted. When the kitchen and bathroom are suspended, the top surface cannot be punched with a hammer, otherwise it will easily cause damage to the waterproof layer and leakage. When paving the ground, the slope should be placed 2%-3% to the floor drain to ensure that there is no water on the ground. The installation should also be carried out according to the specifications. The joints in the wall should be buried as little as possible. After the whole water supply system is installed, the hot and cold water pipes are connected in series to do the pressure test. The pressure should be kept at 0.6Mpa and there is no leakage within 24 hours. Water can enter the wall. The drainage system also needs to pass the water test to ensure that the drainage is smooth, no leakage, no overflow phenomenon, and can be concealed.


厨房漏水


(3) Waterproof construction process


1, handling hygiene


Dispose of the impurity waste in the area first, clean it with a broom, clean the dust, then use a blade to level the base. Fill the pits with defects and pits, and then use the plug to perform surface base treatment.


2, rigid material painting


First seasoning, add a small amount of water, so that the seasoning is relatively dry. Then, first brush the corners of the corners, the roots of the tubes and the walls. After this brushing, use the material to apply a large area to the ground.


3, soft material painting + closing test


After the rigid material is slightly dried, the construction is carried out with a flexible material. First seasoning, when adding water, slightly dilute a little to do the first time. First make the corner of the corner, the root of the tube, then the wall and the ground repeatedly painted. After the application, the second mixing is carried out, a small amount of water is added, the liquid is kept at a certain consistency, and then a large area is applied. After the completion, according to the film conditions on the site and the degree of drying, temperature, after the complete drying, the water shut-off test is carried out, and the water shut-off test is passed after acceptance.


The above is the Xiaobian of the decoration home network to bring you all the contents about the kitchen leak. I believe that after reading this article, the small masters have a basic understanding of the kitchen leak, if you want to know more about decoration consultation, Please click to enter the decoration process section.


More related wonderful reading:

How should the kitchen leak? What precautions?

Kitchen water leakage cause solution and repair kitchen leaking precautions

What are the reasons for the kitchen leaking? What should I do if the kitchen leaks?


Aluminum Diamond Plate 3003-H22 is easy to fabricate and its raised diamond pattern provides good slip resistance and walking stability. 

Application and uses of Aluminum diamond tread plate 3003-H22 bright are: extensive product use as scuff plates, running boards, and mud flaps for fire engines, ambulances, fire trucks, trailers and toolboxes, recreational, and four-wheel-drive vehicles.

 

Aluminum Diamond Plate

Aluminum Diamond plate sheet

Xiaoxian RuiYi Commercial Trade Co.,Limited , https://www.ryaluplate.com