Do you first install the door or install the floor first?

Often there are owners who ask, is it the first to install the door or the first floor? There is no special regulation on this issue. From the actual installation situation of the user, the proportion of the first door and the first floor is not much different. For the owners, it is still necessary to look at the specific situation.

[If you install the wooden door first]

According to the principle of “top-down” of decoration construction, the wooden door should be installed first. This has the following advantages: 1. Tools and materials can be placed directly on the concrete floor without worrying about soiling the floor; 2. After installing the door The baseboard can be closely attached to the door cover for cutting and fixing, which is closely matched, more beautiful, and convenient to close; 3. The finished product protection of the door is relatively easy, and the auxiliary materials, debris and tools in the operation process have less influence on the door. To avoid scratching and abrasion of the door panel.

However, there are some inconveniences in installing the door first: it is not easy to control the gap between the door and the floor. If the reservation is too large, it will affect the sound effect and beauty, such as the bedroom door. If the seam is larger than 0.5cm, the sound effect will be poor, which will affect the rest. If the reservation is too small, it will affect the actual use, such as kitchen and bathroom, door seam. Generally between 0.8-1.5cm, the door joint is large to facilitate the air convection in the functional area, the moisture in the bathroom is discharged, and the wooden products of the bathroom are not easily deformed; and the friction between the door and the floor may occur, and the installation of the wooden door is required to be adjusted twice;

The treatment of the cornice between the floor and the door is troublesome. It is necessary to leave the expansion joint or cut the floor into the shape of the cornice, and then fill it with glass glue, which cannot be seamlessly combined and affects the appearance.

â—†Solution

When installing the door, it is necessary to confirm the specific thickness of the floor, the moisture-proof pad and the corresponding buckle with the worker. The skilled installer can reserve the appropriate size according to the thickness of the floor, but the error is not excluded.

[If the floor is installed first]

As the bottom layer of the floor, it should be at the end, but if it is installed before the door (such as the door has a long custom cycle and the floor material is in place), it has the following advantages: 1. It can accurately guarantee the door and the floor. The gap between the two is guaranteed to be beautiful and practical. 2. If the door is installed first, the installation of various special angles and sizes between the floor and the door frame often occurs. Sometimes, the door lock must be removed at the door contact. In the case of installing the floor first, these problems can be avoided; 3, the first installation of the floor can ensure the tight joint with the door frame, to prevent the gap from appearing so that the water seeps into the door deformation. But at the same time, there are some unfavorable situations when installing the floor first: 1. After installing the floor, reinstalling the door may cause soiling/damage of the floor during operation. The door is heavy, the worker walks, tools, debris, Adhesive accessories, etc., will have an impact on the floor, so it is necessary to protect the finished product; 2. If the floor is installed first, the baseboard is not good.

â—†Solution

Put the carton board and other materials on the floor before installing the door; cut the sawing material in the corridor or balcony to avoid leaving too much dust indoors; the tool is lightly handled; the skirting on both sides of the door is not installed temporarily, and the seller of the door The consultation is good, and the kicking line of these places is installed by the door-mounted workers.

【Special case】

If it is not the floor, such as bedroom floor, living room tile, the door is installed first; if the floor is solid wood floor, it is recommended to install the door first, because the solid wood floor is more vulnerable to damage, to prevent scratching, first need to install the door; If the floor tiles are paved, the tiles are first paved and the doors are sealed to prevent the watermark from being laid on the door cover.

[Prerequisites for installation of wooden doors and floors]

The adhesion base layer of the wooden door and the floor needs to be basically dry, and the humidity is too high, and the drum, crack, deformation, and the like are likely to occur. In particular, the new wall and the new ground should be flat. The wall should be firm, square, vertical and dry. The ground should be horizontal, dry and free of sand. The hollow drum and crack should be controlled within the quality requirements. The flatness is in line with the shop. Loading requirements.

【in conclusion】

According to the statistics of the relevant industry authorities, 65% of the homes are installed first, and 35% of the first floor is installed. These two processes have their own advantages and disadvantages, and their substantive impact is not significant. The key is to coordinate and connect the processes and to protect the finished products. For example, if the door is installed first, the thickness of the floor should be confirmed by the worker to leave a suitable gap. If the floor is installed first, the worker who has installed the door will negotiate with him to handle the skirting on both sides of the door. The owners can make decisions based on their actual situation (work schedule, materials in place, etc.).

1.Our Polycarbonate Sheet,tiles will not be broken within 10 years under the weather and impact strength. Yellowing index and transmittance loss will not exceed the value defined by warranty;

 

2.We guarantee for the surface of pc sheet not caused collateral damage due to hail impact, but our guarantee not including the damage caused by other impacts such as scratches, abrasions, exposure, self-storage, transportation, handling and improper installation, physical and chemical changes occur.

Polycarbonate Sheet

Solid Polycarbonate Sheet,Clear Solid Polycarbonate Sheet,Solid Polycarbonate Roofing Sheets,Solid Polycarbonate Panels

FOSHAN KASO BUILDING MATERIAL CO.,LTD , https://www.kasocover.com